| Global Defense, OSINT & Geopolitics Wire

[🇧🇩] Water & River Management of Bangladesh

[🇧🇩] Water & River Management of Bangladesh
29
1K
More threads by Saif

G Bangladesh Defense

Drinking water management: Crisis, inequality, need for effective action

Shahiduzzaman

1778546223700.webp

A woman collects water from an inundated tube well amid a crisis of drinking water in Kamalpur, Sariakandi of Bogura. Prothom Alo file photo

The demand for safe drinking water is a long standing issue in Bangladesh and continues to be one of the most urgent public concerns. Safe drinking water is a basic human necessity, yet millions of people are still deprived of it. The government has the responsibility to ensure access to safe and affordable water for all citizens, and this issue must be treated as a national priority because it is directly linked to health, dignity, and human rights.

Despite significant investments and policy initiatives, drinking water management still faces serious challenges. Weak implementation, lack of initiatives, inequality and governance failures, have reduced the effectiveness of many programs. According to reports by the World Bank, improvements in infrastructure have not always ensured safe and reliable water access, especially for vulnerable populations.

Public dissatisfaction has grown over the years, leading to repeated protests in different parts of the country. In coastal districts such as Satkhira and Khulna, communities have organised rallies demanding access to fresh water due to salinity intrusion, as highlighted in field reports supported by UNICEF. In urban areas like Dhaka and Chattogram, residents have protested against contaminated supply water, complaining about foul smell and health risks. These incidents show that safe drinking water is not just a service issue but a matter of survival and public demand.

The government allocates a significant budget each year for water supply and sanitation under the national development program. In the 2025 to 2026 fiscal year, around Tk 9,000 to 11,000 crore has been allocated for water, sanitation, and hygiene related sectors. However, according to assessments by the World Bank and UNICEF, the improvement in water quality and service delivery remains limited despite increased spending.

Corruption and weak governance remain major barriers. Misuse of funds, overpricing of contracts, and poor quality construction are frequently reported issues. According to Transparency International, lack of transparency and accountability in public sector projects significantly affects service delivery and reduces the long term benefits of investments.

Another major issue is poor management and maintenance. Even when treatment plants are installed, many become nonfunctional within a short time due to lack of monitoring and technical capacity. Studies cited by the World Bank indicate that institutional weakness and poor coordination are key reasons behind unsafe drinking water systems in developing countries.

Drinking water has also become a growing private business in Bangladesh.

The bottled and jar water industry is estimated to be worth Tk 3,000 to 5,000 crore annually, with a steady growth rate of around 10 to 15 percent, as discussed in market analyses referenced by the World Bank. While this creates economic opportunities, it raises serious concerns about inequality. The The United Nations recognizes access to safe drinking water as a fundamental human right, essential for life, health, and human dignity. However, the reality across many parts of the world tells a different story.

Safe water is increasingly being treated as a paid commodity rather than a basic right. As water systems become commercialised and privatised, access often depends on the ability to pay rather than the urgency of need.

This growing trend creates a deep inequality within society. Wealthier individuals and communities can afford purified, reliable water through bottled supplies or advanced filtration systems. In contrast, poorer populations are frequently left with limited options, relying on contaminated or unsafe water sources for their daily needs. This not only exposes them to serious health risks but also reinforces cycles of poverty and vulnerability.

When access to clean water becomes dependent on income, it undermines the principle of equality and basic human rights. Ensuring safe, affordable water for all must remain a global priority.

Government supplied water is often unsafe due to leakage, illegal connections, and poor pipeline systems. According to studies published through the World Health Organization, contamination frequently occurs between treatment plants and households, making water unsafe for direct consumption.

Water treatment facilities are also insufficient. Many plants are outdated or poorly maintained, and rural areas often lack any treatment systems. Bangladesh continues to face severe arsenic contamination, affecting around 20 million people, as reported in research supported by UNICEF and other international studies.

The situation is even more critical in coastal regions. Recent estimates suggest that more than 40 million people live in coastal areas, and about 20 to 25 million of them face direct drinking water shortages due to salinity intrusion. Findings from World Bank and Asian Development Bank highlight that climate change has intensified this crisis, making freshwater sources increasingly scarce.

Natural water sources such as rivers, ponds, and canals are heavily polluted due to industrial discharge, agricultural chemicals, and domestic waste. Studies referenced by the World Health Organization indicate that a large proportion of surface water in Bangladesh is unsafe without proper treatment.

Unsafe drinking water has led to a serious public health crisis. According to estimates from the World Health Organisation and UNICEF, between 100,000 and 150,000 people die each year in Bangladesh due to waterborne diseases. Millions more suffer from illnesses such as diarrhoea, cholera, and typhoid. Children are the most affected group, and diarrheal diseases remain among the leading causes of death in the country.

Bangladesh has received strong international support to improve water management. Organizations such as the World Bank, Asian Development Bank, UNICEF, and World Health Organization have invested billions of dollars in water and sanitation programs. However, their evaluations often highlight challenges such as weak implementation, limited local capacity, and sustainability issues.

The government must take stronger responsibility to ensure safe drinking water at low cost for all citizens. This issue must be treated as a priority.

There are important lessons to learn from international experiences in water management. Countries like Singapore and the Netherlands have built highly efficient and sustainable water systems through strong governance, long-term planning, and the use of advanced technology. Singapore, for example, has invested heavily in water recycling and desalination, reducing its dependence on external sources. The Netherlands, known for its expertise in water control, has combined engineering innovation with strict policy frameworks to ensure both safety and sustainability.

In India, several regions have shown progress through community-based water management. Local participation in maintaining water resources, along with government support, has improved access and accountability. According to reports from the World Bank, integrated water resource management—where water supply, sanitation, and environmental protection are addressed together—can significantly improve outcomes.

These examples highlight that effective governance, technological innovation, and community involvement are key to ensuring safe and equitable water access for all.

Despite heavy investment, progress remains slow because many projects focus on construction rather than long term sustainability. This reflects deeper governance and planning issues.

Drinking water management in Bangladesh is not only a technical challenge but also a matter of governance, equality, and human rights. The government must take stronger responsibility to ensure safe drinking water at low cost for all citizens. This issue must be treated as a priority.

Ensuring transparency, reducing corruption, strengthening monitoring systems, regulating private water businesses, and investing in sustainable and climate resilient solutions are essential. Safe drinking water should never be treated as a luxury or a business commodity. It is a fundamental human right, and ensuring it is the responsibility of the state.

* The author is a freelance writer​
 

PM chairs meeting on DND dam to find ways to resolve water-logging

BSS

Published :
Jun 03, 2026 20:17
Updated :
Jun 03, 2026 20:17

1780532402700.webp


A meeting on the Dhaka-Narayanganj-Demra (DND) Embankment was held on Wednesday with Prime Minister Tarique Rahman in the chair to find solutions to the long-standing water-logging problem in the embankment area.

The meeting was held at the Prime Minister's Cabinet Division office in the secretariat in Dhaka on Wednesday afternoon, said Prime Minister's Deputy Press Secretary Md Suzauddhowla (Sujon Mahmud).

He said the meeting discussed in detail the long-standing water-logging problem in the DND embankment area and possible ways to resolve it.

After the meeting, Water Resources Minister Md. Shahiduddin Chowdhury Anee said that the DND embankment area had long suffered from waterlogging and that much of the problem still remains.

A project addressing the issue was undertaken in 2016 and completed in 2024, he said, adding, however, unfortunately, ordinary people have not yet received the expected benefits.

The minister said that the project completed by the Ministry of Water Resources would be handed over to the city corporation within the next two weeks.

Anee said a new plan is being taken to further improve the drainage system in the DND area. The proposal to develop an additional 30 kilometers of drainage infrastructure across the area has been brought to the Prime Minister's attention, he added.

Expressing optimism, he said the desired results could now be achieved through the management of the city corporation and the combined efforts of all concerned.

State Minister for Water Resources Forhad Hossain Azad, State Minister for LGRD and Cooperatives Mir Shahe Alam, Dhaka South City Corporation (DSCC) Administrator Abdus Salam and Rajdhani Unnayan Kartripakkha (RAJUK) Chairman Engineer Md Reazul Islam were present at the meeting.​
 

Bangladesh, a river civilisation

BANGLADESH was not born from stone. Bangladesh was born from water. Every year, rivers break this land apart, and those same rivers build new land again. People sow seeds again. They build homes again. They sing again. They love again. They begin again. This rebirth is Bangladesh’s first identity. The true culture of Bangladesh was not born in a palace. It was not created on an emperor’s throne. It was born in rice fields, in muddy villages, in the oars of boatmen, in the nets of fishermen, in the sweat of farmers, in the songs of Bauls, and in the breath of the mangroves of the Sundarbans.

This land has given the world a lesson that modern civilisation has almost forgotten: Nature is not our property. Nature is our teacher. To me, this truth belongs not only to the modern state of Bangladesh, but to the whole of Bengal. When I say “Bangladesh,” I speak of the greater Bengali homeland—the rivers, forests, songs, and memories that flow across today’s political border. I see Bangladesh and West Bengal not as strangers, but as two shores of the same civilisation. Political history divided Bengal, but it did not divide the rivers, the monsoon, the language, or the cultural memory of its people. The borders of states may change; the soul of a civilisation endures.

No symbol expresses this spirit more beautifully than Bonbibi.

Bonbibi is one of the world’s most remarkable cultural figures. In the traditional stories of the Sundarbans, she is portrayed as a Muslim woman whose origins are deeply rooted in Islamic and Sufi tradition. Yet over centuries she came to be embraced by both Muslims and Hindus. Many Muslims honor her as a saintly protector of the forest, while many Hindus revere her as a goddess. Few places on Earth have created such a profound symbol of shared faith. That is the genius of Bengal. Rather than asking whether Bonbibi belongs to one religion or another, Bengal transformed her into something greater—a guardian of humanity itself.

For hundreds of years, honey collectors, fishermen, woodcutters, and villagers have entered the Sundarbans carrying Bonbibi in their hearts. Before entering the forest, they pray not for domination, but for humility. They ask not for power over nature, but for permission to live within it. Bonbibi teaches that greed destroys, while humility preserves life.

The forest is not to be conquered. The forest is to be respected. When one enters the Sundarbans, every human identity becomes small. The tiger does not ask your religion. The river does not ask your language. The cyclone does not ask your wealth. The forest asks only one question:

Did you come with reverence? Within that question lies the wisdom of thousands of years of Bengali civilisation.

Bangladesh’s greatest strength has never been its weapons. Its strength has always been its ability to coexist—with rivers, forests, storms, animals, and with one another. This land teaches that rivers cannot be murdered without consequence. Forests cannot be destroyed without destroying ourselves. The soil cannot be plundered forever. Human beings are not the masters of nature; we are participants within it. The people of this delta learned to read the sky before they learned to read books. They learned the language of tides, the rhythm of birds, the medicine of leaves, and the patience of the seasons. They learned to love life even in the presence of floods, cyclones, and uncertainty.

his is Bengal’s civilisation. A civilisation where poetry is resistance. Where song is prayer. Where rivers are memory. Where forests are sacred. Bangladesh cannot be understood by a map alone. It must be understood through its rivers. Through the silence of the Sundarbans. Through the scent of rice fields after rain. Through Baul songs. Through village wisdom. Through Bonbibi.

As long as the Padma, the Meghna, the Jamuna, and countless other rivers continue to flow toward the sea, and as long as the people of Bengal remember that nature is our teacher, neighbours are our kin, and compassion is stronger than greed, Bangladesh will remain far more than a state.

It will remain one of humanity’s greatest river civilisations — a place where people, nature, and the Divine have spoken to one another for centuries in the language of water.

Anusheh Anadil is a singer and social activist.​
 

Work remains incomplete, yet nearly full bill paid for water project

M Jashim Uddin

Published: 01 Jul 2026, 15: 37

1782950728277.webp

Map of Barguna district Prothom Alo illustration

Allegations of irregularities, nepotism and substandard work have surfaced in a rainwater harvesting project in Barguna, yet the contractor has already received payment.

Despite remaining incomplete on the ground, one package was shown as fully completed on paper and paid in full, while 78 to 96 per cent of the bills for two other packages respectively were also cleared by the implementing agency, the Department of Public Health Engineering (DPHE).

The government has been implementing a rainwater harvesting project across 10 districts to address the severe shortage of safe drinking water in the coastal belt.

In Barguna, the project, involving three packages worth nearly Tk 360 million (36 crore), has been plagued by allegations of corruption and irregularities.

On 25 October last year, Prothom Alo in its print edition published a report titled "Irregularities, nepotism in Tk 36 crore project in Barguna" detailing these issues. Despite the allegations, most of the bills were quietly paid in February this year without assessing the quality of the work or investigating the reported irregularities.

When Prothom Alo sought information regarding the payments, DPHE officials delayed the process for a long time. Eventually, after an application was filed under the Right to Information (RTI) Act, the relevant documents were obtained on 15 March.

The documents show that a final bill of Tk 114.88 million was paid for Package No. 39. Although work under Package No. 38 was officially listed as ongoing, nearly Tk 99.8 million—about 78 per cent of the contract value of Tk 127.28 million—had already been paid.

For Package No. 40, Tk 112.16 million, or 96 per cent of the contract value of Tk 115.87 million, had been disbursed.

Deadline extended, work remains incomplete

The 'Rainwater Harvesting System' project is being implemented in Barguna under the DPHE at a cost of Tk 360 million. Under the project, 5,542 families in three coastal upazilas are supposed to receive water tanks with a capacity of 3,000 liters. The allocation for each unit is Tk 45,000.

Barguna-based contractor M/s Kamal Enterprise was awarded all three packages. Initially scheduled to run from July 2022 to December 2025, the project’s deadline has now been extended to December of this year due to the non-completion of work.

A spot visit in September last year revealed that work in some areas was done haphazardly, while in others, it was left half-finished. A follow-up visit to the project areas in May this year found that the situation remained largely unchanged.

According to the project design, a platform is supposed to be built by excavating the designated spot, fortifying the base with sand and then laying a 10-inch cement concrete (CC) casting topped with a 5-inch brick masonry. A 3,000-liter tank is then to be placed on this platform and connected to the tin roof via a pipeline to collect rainwater.

However, visits showed that in many places only the platform had been built and left unfinished. In some locations tanks had been installed but pipelines were missing, while in others no pipeline had been installed at all.

Several beneficiaries in the villages of Chalitatoli and Falishatoli in Barguna Sadar, as well as Boro Tengra, Koralia and Chhoto Tengra in Patharghata upazila, told Prothom Alo that only the base infrastructure had been built at their homes. They reported that necessary equipment, including tanks, pipelines, and filters, had not been provided.

Evidence of incomplete and substandard work was also found during visits to several houses under package No. 39, for which the final bill has already been paid in full. For instance, at the house of Md. Ibrahim Howlader in Falishatoli village under M Baliatoli Union of the Sadar upazila, the project work is shown as ‘complete’ on paper, but in reality, it does not exist.

Multiple attempts were made to contact Kamal Hossain, the proprietor of the contracting firm M/S Kamal Enterprise, for his comments on the matter but he did not answer his phone. Later, messages were sent to his mobile and via WhatsApp, but no response was received.

Questions raised over bill payments

A source within the DPHE revealed that Raisul Islam was serving as the Executive Engineer in Barguna when the bills were paid. He is currently stationed in Tangail.

When asked about clearing the final bill for package No. 39 despite the work being incomplete, Raisul Islam told Prothom Alo over the phone, "I cannot recall at this moment whether I cleared the final bill for package 39. The sites for all the packages are so scattered that it is difficult to specify which ones are complete and which are incomplete."

Project Director Badshah Mia confirmed the payment of the bills. "It is not supposed to happen that partial work was done for some listed beneficiaries while nothing was done for others," he said. "If we receive specific information, we will verify it and take necessary action."

Earlier, in October last year, Project Director Badshah Mia had told Prothom Alo, "I too have received allegations of irregularities, not just from Barguna but from other districts as well. I will personally visit the sites, and I will not make any concessions in ensuring the work is flawless."

Shishir Kumar Biswas, the current Executive Engineer of the DPHE in Barguna said, "Before a final bill is paid, a certificate from the beneficiary, a bank receipt for the supporting subscription and a final field-level report are mandatory. It is not possible to comment on this without verifying the documents.

He added that, if evidence of irregularities is found, action will certainly be taken.

Rafiqul Alam, divisional member of the Barishal chapter of the National Water Rights Forum, formed to ensure access to safe drinking water in coastal areas and director of the private research organisation Reach to Unreach, said those responsible for this large-scale misuse of public funds must face action and be brought under accountability.​
 

Time to move beyond project-based dredging to long-term river management

Shahrina Akhtar

1795478503876.webp

About 12,000 km of our water bodies were considered navigable in the 1960s. At present, the number is closer to 7,500 km. FILE PHOTO: MOSTAFA SHABUJ

In June 2022, Cherrapunji in Meghalaya recorded 972 mm of rain in 24 hours, the highest June figure in 122 years, and about 2,500 mm in three days. Within days, around 80 percent of Sylhet division was under water. Two years later, the area flooded again. Each time, the reason cited is “heavy rain upstream”. But Meghalaya has always been one of the wettest places on earth. What has changed is what happens to that water once it crosses into Bangladesh.

Bangladesh has 58 transboundary rivers, 55 of which are shared with India while three are shared with Myanmar. Along the Meghalaya border alone, a long line of rivers pours into our northern districts.

The Bhogai and Chillakhali enter Sherpur, and the Bhogai flows on as the Kangsha through Mymensingh and Netrokona. The Nitai enters Mymensingh. The Someshwari—known upstream as Simsang—enters Netrokona in Durgapur. The Jadukata, Jalukhali, Nawagang, and Umiam enter Sunamganj. The Dhala, the Piyain through Jaflong, and the Sari-Goyain at Jaintiapur enter Sylhet. Dozens of smaller hill streams, which we call “chhara”, also join them every monsoon.

These rivers bring water, sand, gravel and silt from young, steep hills. Rivers in our delta carry about 2.4 billion tonnes of sediment a year. Handled well, this sediment can be a gift. One study found that about 1,800 sq km of new land formed between 1943 and 2008 where the great rivers meet the sea. But when handled poorly, the sediment settles in our riverbeds, raises them, and can turn heavy rainfall into floods.

Of course, sediment is not the only culprit. We have built roads across haors, narrowed rivers with embankments and markets, filled canals to put up buildings, and fitted sluice gates that stay shut when they should be open. Together, these structures act like a dam spread across the country. When the hills send down a sudden surge, the water meets these barriers, slows, drops its silt, and spreads into homes and fields instead of moving on towards the Meghna and the sea.

The 2012 dredging master plan targeted 53 rivers for capital dredging and 10,000 km of new waterways. A Mongabay investigation in December 2024 counted Tk 2,763 crore for the Old Brahmaputra, Tk 4,371 crore for a four-river initiative, and Tk 850 crore for the Indo-Bangladesh protocol route. But at more than 40 points along the four rivers, no notable improvement was found. Dredged sand had been piled on the banks, and rain washed it back into the channel.

Sylhet tells the same story. A Tk 50 crore project to dredge 15 km of the Surma began in 2023, but delivered little as only scattered sections were dug. Nearly Tk 1,500 crore has been spent on the city’s waterlogging over 15 years, and 35 sandbars still sit in a 32-km stretch of the Surma’s source area. Across the country, about 12,000 km of our water bodies had been considered navigable in the 1960s. At present, the government is reportedly maintaining 7,500 km of waterways through regular dredging, with recent plans to add around 5,700 km.

This signals project-based thinking. A project has a budget, a contractor, a completion date, and an inauguration photograph. But a river needs a channel that stays open every year, a floodplain where water can spread, and a free path to the sea. When a project ends, the river fills up again, and a new project is proposed. The cycle keeps money flowing, but not the water.

We must move away from project-based thinking and towards problem-based solutions. Every drop of water that enters Bangladesh must find an unobstructed path to the Bay of Bengal, carrying its sediment with it. That should be the test for every road, embankment, bridge, sluice gate, and dredging plan in the country.

In our own southwest, Tidal River Management (TRM) has shown how sediment can be put to work. At Bhaina Beel, about 6.45 million cubic metres of sediment settled over roughly four years, raising waterlogged land instead of choking the river.

In 2019, the High Court declared all rivers of Bangladesh living entities and named the National River Conservation Commission (NRCC) their legal guardian. What is missing is a law with teeth and the will to enforce it. Five steps would make the difference.

First, make free flow a legal right of every river and require hydraulic clearance from the NRCC before any road, embankment, or structure is built across a river, canal, or haor. The second step would be to map each river’s natural course and floodplain, publish the boundaries, and remove structure which block them (no matter who they belong to). Thirdly, replace one-off dredging projects with long-term maintenance contracts, with payments made only if the channel stays open through the next monsoon, upon verification by an independent body. Fourth, ban the dumping of dredged soil on riverbanks and use sediment to raise low land and build chars, as TRM does. Fifth, put sediment and flow on the Joint Rivers Commission’s agenda, starting with the rivers which flow in from Meghalaya, with rainfall and river data shared in real time.

In a delta, flooding is inevitable. But a flood that passes in days brings fish, silt, and fertile soil to our fields. A flood that stays for weeks is a disaster. The difference lies in whether the water can reach the sea. Our rivers need more room, not ribbon-cutting. Let the water in and help it flow into the sea.

Dr Shahrina Akhtar is assistant professor at the Institute of Development Studies and Sustainability (IDSS) at United International University (UIU), and adjunct faculty member in the Department of Agriculture at Daffodil International University.​