Power generation from the under construction Stage-I of Dasu Hydropower Project to commence in 2026.
Cumulative installed capacity of the Project stands at 4320 MW with two Stages of 2160 MW each.
Cumulative installed capacity of the Project stands at 4320 MW with two Stages of 2160 MW each.