- Joined
- Jan 24, 2024
- Messages
- 3,799
- Likes
- 2,028
Padma Bridge wins International Bridge Association's "Contribution to International Social Development" Award
Date: November 22, 2024 【Font size: large, medium, small】
Print
Zurich, Switzerland: At 18:00 local time on November 12, the 2024 Awards Ceremony of the International Association for Bridge and Structural Engineering (IABSE) was held in Zurich, Switzerland.
The Padma Bridge in Bangladesh, which was surveyed and designed by China Railway Major Bridge Engineering Group Co., Ltd., constructed by China Railway Major Bridge Engineering Group Co., Ltd., and built by China Railway Shanqiao and China Railway Jiuqiao under China Railway Industry, won the "International Social Development Contribution" Award.
The Padma Bridge was completed and opened to traffic on June 25, 2022.
It is currently the largest bridge construction project in Bangladesh and the first steel truss bridge with a fully welded structure, ultra-thick plate, and dual-use road and rail using European standards.
The bridge spans the Padma River in Bangladesh. The main bridge is 6.15 kilometers long. The upper level is a two-way four-lane highway, and the lower level is a single-track railway.
After the completion and opening to traffic, the bridge ended the history of ferrying passengers and freight across the Padma River between the 21 southern districts of Bangladesh and the capital Dhaka, eastern and northern Bangladesh, and shortened the crossing time from more than 7 hours by ferry or detour to 10 minutes, benefiting nearly 80 million people in Bangladesh, improving regional connectivity, and promoting the economic development of Bangladesh and even South Asia.
Project Description:The Padma Bridge in Bangladesh, which was surveyed and designed by China Railway Major Bridge Engineering Group Co., Ltd., constructed by China Railway Major Bridge Engineering Group Co., Ltd., and built by China Railway Shanqiao and China Railway Jiuqiao under China Railway Industry, won the "International Social Development Contribution" Award.
The Padma Bridge was completed and opened to traffic on June 25, 2022.
It is currently the largest bridge construction project in Bangladesh and the first steel truss bridge with a fully welded structure, ultra-thick plate, and dual-use road and rail using European standards.
The bridge spans the Padma River in Bangladesh. The main bridge is 6.15 kilometers long. The upper level is a two-way four-lane highway, and the lower level is a single-track railway.
After the completion and opening to traffic, the bridge ended the history of ferrying passengers and freight across the Padma River between the 21 southern districts of Bangladesh and the capital Dhaka, eastern and northern Bangladesh, and shortened the crossing time from more than 7 hours by ferry or detour to 10 minutes, benefiting nearly 80 million people in Bangladesh, improving regional connectivity, and promoting the economic development of Bangladesh and even South Asia.
The main bridge of Padma Multipurpose Bridge has a length of 6150 meters, featuring an outstanding design with large-diameter steel raking pile composite foundation and epoxy-glued roadway deck - continuous steel truss composite structure. Its successful construction has increased national GDP and reduced poverty rate.
Judges Comments
With an overall length of over 6km, this long-awaited crossing provides an essential transportation and services link between the two previously disconnected parts of Bangladesh, separated by the huge Padma River. The double level steel truss with composite concrete deck slabs, carries rail on the lower level and a 4-lane highway on top. Very deep riverbend silt with excessive scour depths and the risk of liquefaction demanded an innovative approach for the large diameter raking steel piles with lengths up to 125m.
Structural Designer
AECOM
Location
Dhaka, Bangladesh
More images of Padma Bridge during construction below
Last edited:


































