Follow along with the video below to see how to install our site as a web app on your home screen.
Note: this_feature_currently_requires_accessing_site_using_safari






| Reactor Unit | Type | Net Capacity [MW(e)] | Status | Operator | Reactor Supplier | Construction Date | First Criticality Date | First Grid Date | Commercial Date | Shutdown Date | UCF for 2021 |
| CHASNUPP-1 | PWR | 300 | Operational | PAEC | CNNC | 8/1/1993 | 5/3/2000 | 6/13/2000 | 9/15/2000 | 85.9 | |
| CHASNUPP-2 | PWR | 300 | Operational | PAEC | CNNC | 12/28/2005 | 2/22/2011 | 3/14/2011 | 5/18/2011 | 98.4 | |
| CHASNUPP-3 | PWR | 315 | Operational | PAEC | CNNC | 5/28/2011 | 8/1/2016 | 10/15/2016 | 12/6/2016 | 99.2 | |
| CHASNUPP-4 | PWR | 313 | Operational | PAEC | CNNC | 12/18/2011 | 3/15/2017 | 6/25/2017 | 9/19/2017 | 84.4 | |
| KANUPP-2 | PWR | 1014 | Operational | PAEC | CZEC | 8/20/2015 | 2/28/2021 | 3/18/2021 | 5/21/2021 | 98.6 | |
| KANUPP-3 | PWR | 1014 | Operational | PAEC | CZEC | 5/31/2016 | 2/21/2022 | 3/4/2022 | 4/18/2022 | 0.0 | |
| KANUPP-1 | PHWR | 90 | Permanent Shutdown | PAEC | CGE | 8/1/1966 | 8/1/1971 | 10/18/1971 | 12/7/1972 | 8/1/2021 | 30.7 |


Loading...