Little interest in offshore gas exploration, new initiative taken

Mohiuddin


1793064328471.webp

Offshore oil and gas exploration File Photo

There has been little response to Bangladesh’s latest bidding round for offshore oil and gas exploration in the Bay of Bengal. No company participated in the bidding round that closed during the interim government’s tenure. The current government wants to avoid a repeat of that outcome.

The Energy Division is therefore making efforts to attract foreign investment in offshore exploration, holding direct meetings with various companies to gather their views. The deadline for submitting bids has already been extended by four months.

Sources at the Energy and Mineral Resources Division said separate meetings were held in London with 10 multinational companies on 29 and 30 September and 1 October. Discussions focused on the ongoing bidding round and the production sharing contract (PSC). The companies expressed satisfaction with the new PSC. They want to assess investment risks and the prospects of finding gas before deciding whether to participate in the bidding.

Two senior officials of the Energy Division told Prothom Alo that a delegation led by the state minister for power, energy and mineral resources attended the meetings in London. Meetings were also held with six companies in Singapore.

The government has given serious consideration to the views of multinational companies. It has therefore decided to make all available data on the Bay of Bengal’s hydrocarbon potential accessible to them. This will allow companies to examine the information and make informed investment decisions.

Amid the conflict in the Middle East, companies are exercising greater caution over investments. The bidding deadline has been extended for this reason as well.

Two senior Petrobangla officials said companies had conducted surveys as part of offshore exploration and submitted the resulting data. Six separate sets of survey data are available. Each set was priced at USD 1 million in the 2024 bidding round, while the price in the current round was USD 568,000.

Four sets of data have now been made available free of charge. The price of each of the remaining sets has been reduced to USD 5,000. Officials hope the move will encourage multinational companies to take an interest in the bidding. The companies will be able to analyse the data before deciding whether to invest.

Bangladesh has been facing an increasingly severe energy crisis for several years as domestic gas production continues to decline. Nearly a decade and a half after settling its maritime boundary disputes, the country has yet to discover a commercially viable offshore gas field.

The maritime boundary disputes with Myanmar and India were settled in 2012 and 2014, respectively. However, the previous Awami League government did not invite competitive bids for offshore exploration for more than a decade.

A bidding round was launched in March 2024, but that government fell in August of the same year. The interim government subsequently extended the deadline for bid submissions by three months. Although seven companies purchased bidding documents, none submitted a bid.

After taking office, the current government prioritised oil and gas exploration in the country. In May, it invited bids for exploration in 26 offshore blocks, including 15 in deep water and 11 in shallow water.

The original deadline for submitting bids was set for 30 November, with the bidding period running from 1 June. The deadline has now been extended to 31 March 2027.

According to Petrobangla, three companies had purchased bidding documents as of 25 October. Turkey’s Turkish Petroleum Overseas Company purchased documents on 23 July, while China’s CNOOC International did so on 17 August. Another Chinese company, Sinopec, purchased the documents last month.

None of these companies has previously participated in oil and gas exploration in the Bay of Bengal.

Sources at the Energy Division and Petrobangla said the companies consulted in London were among the world's leading oil and gas firms.

On 29 September, meetings were held with Murphy Oil of the United States, Petrobras of Brazil, Kuwait Foreign Petroleum Exploration Company (KUFPEC) of Kuwait, Geo Exploration of Australia, Union Energy Group of Singapore and Valeura Energy of Canada.

On 30 September, discussions took place with Italy’s Eni, US-based ExxonMobil and the United Kingdom’s BP. The final meeting, on 1 October, was with another leading company, the UK-based Shell.

Senior executives from these companies recommended making offshore survey data publicly available. They also requested more time to analyse the information.

Six Asian companies consulted in Singapore expressed similar views. Meetings are also expected to be held with several leading US companies in Houston early next year.

Anindya Islam Amit, state minister for power, energy and mineral resources, told Prothom Alo that the government had held direct discussions with multinational companies and sought their opinions. Discussions had also taken place with energy ministers from several countries, whose governments invest jointly with multinational companies.

“The deadline has been extended in response to market demand. The data has been made accessible and more readily available in line with the companies’ requests,” he said.

He expressed hope that the changes would generate a stronger response to the bidding round.

Bangladesh’s first offshore bidding round in 1974

Sources at the Energy Division and Petrobangla said the then Mujib government enacted a law on maritime boundaries in 1973. A bidding round for offshore oil and gas exploration was also launched that year.

Production sharing contracts were subsequently signed with six foreign companies. One of them, Union Oil Company, later renamed Unocal, reported a gas discovery in Kutubdia.

However, after the government led by Khondaker Mostaq came to power, all the foreign companies left Bangladesh.

Another bidding round was held in 1988, but no company participated.

Under the PSC-1994 framework, the government signed an agreement with British company Cairn Energy. The company discovered the Sangu gas field and began production in 1998. Gas production continued there until 2013, when operations were suspended because no commercially recoverable reserves remained.

In 2007, Australia’s Santos acquired shares from Cairn and took over operations at the field.

Under PSC-2008, US company ConocoPhillips signed an agreement and began deepwater exploration in 2010. The company left in 2015 after its demand for a higher gas price was not met.

Under PSC-2012, Australia’s Santos entered two shallow-water blocks in 2014, while India’s ONGC took up operations in two other blocks.

Santos announced its withdrawal from the region in 2020. South Korean company POSCO Daewoo entered under a special PSC in 2017 but also left after demanding a higher gas price.

ONGC was the latest company to withdraw, leaving last year. It drilled one offshore well but found no gas.

A draft PSC was finalised in 2019, but no bidding round was launched because foreign companies showed little interest.

Industry insiders said the Mujib government had a provision prohibiting foreign companies from appointing local agents. However, no such requirement was imposed in subsequent bidding rounds. At different times, influential local individuals acted as representatives of foreign companies.

Maqbul Elahi Chowdhury, a former member responsible for gas at the Bangladesh Energy Regulatory Commission (BERC), told Prothom Alo that 46 foreign companies had participated during Bangabandhu Sheikh Mujibur Rahman’s tenure. All relevant data had been made available free of charge at the time.

Seventeen companies also participated in 1994, he said.

“Bureaucratic complications have increased since then. Work that should take three days does not get done in three months. This discourages companies from participating,” he said.

Companies assessing investment risks

An analysis of the production sharing contracts shows that under PSC-2019, the price of gas was set at USD 7.25 per thousand cubic feet for deepwater blocks and USD 5.50 for shallow-water blocks.

PSC-2023 abandoned fixed prices and linked the price of gas in both deepwater and shallow-water blocks to 10 per cent of the price of Brent crude oil.

Under PSC-2026, the rates have been increased to 11 per cent for deepwater blocks and 10.5 per cent for shallow-water blocks.

As international oil prices rise or fall, gas prices will change proportionately. If crude oil reaches USD 100 per barrel, the price of gas from deepwater blocks would be USD 11 per thousand cubic feet.

However, the new contract will set upper and lower limits for the Brent-linked price over each five-year period to prevent gas prices from rising or falling excessively.

Under the agreement, the contractor will be responsible for building pipelines to transport offshore gas. The contractor will receive a tariff that takes into account gas reserves, supply and transportation costs.

This provision was absent from the previous PSC.

The formula for sharing profits between multinational contractors and Petrobangla has also been revised. If a contractor wishes to continue operations despite unsuccessful exploration, its share of profits could increase by one to two percentage points.

The interim government had previously introduced another incentive for foreign oil and gas exploration companies by amending labour laws. The companies’ contribution to the workers’ welfare fund was reduced from 5 per cent of profits to 1.5 per cent. Officials believe this could also encourage investment.

Several existing incentives have been retained. Imported goods will remain exempt from taxes and customs duties, while Petrobangla will pay income tax on behalf of contractors.

If Petrobangla does not purchase the gas, contractors will be allowed to sell it to third parties within Bangladesh. They will also be permitted to export gas if there is insufficient domestic demand.

Either party will be able to refer disputes to international arbitration.

In shallow-water blocks, the state-owned Bangladesh Petroleum Exploration and Production Company (BAPEX) will retain a 10 per cent participating interest.

Two officials who attended the meetings said the government had held direct discussions with several Asian companies following the London meetings. None of the companies had raised objections to the PSC. This is the best PSC so far in our history.

Every possible incentive has been offered. The price is almost equivalent to that of liquefied natural gas (LNG), one of the officials said.

The officials also believe that the presence of an elected government has helped build investor confidence.

However, companies will benefit from these incentives only if they discover gas. If exploration fails, they stand to lose their entire investment.

Multinational companies therefore tend to take more time when considering offshore investments.

Officials warned that another failed bidding round would have serious consequences for Bangladesh’s gas sector. The government is making every effort to increase participation by extending the deadline.

They said bidding rounds should be held regularly every year. Even if a company does not participate in one round, it may consider joining the next. Long gaps between bidding rounds, as in the past, should be avoided.

Energy expert M Tamim told Prothom Alo that much would depend on the international situation. Interest is high now because gas prices are elevated. But multinational companies will also consider future market conditions and examine the investment proposals available in other countries. They will assess the potential returns against the risks before making a final decision.

He added that it was difficult to predict how many companies would ultimately participate in the bidding round.​
 

Gas erupts during tube-well drilling in Cox’s Bazar


1793143824928.webp



Instead of water, natural gas has started spewing from a 1,000-foot-deep borehole drilled in the Inani area in Ukhia upazila of Cox’s Bazar district.

A fire broke out around 6:00 am on Tuesday in an area near a small bridge at Inani.

Upon receiving the report, three units from the Fire Service arrived at the scene and started working to bring the blaze under control.

Belal Uddin, a supervisor for beach personnel under the district administration at Inani, said that a man named Md Abdullah is constructing a resort on his 20-decimal plot of land at Sikdarpara, Inani. Work on installing a tube-well to provide water for the resort had been going on for the last 15 days. Drilling was halted three days ago after no water was found, even at a depth of approximately 1,000 feet.

Then, at around 6:00 am this morning, gas suddenly began to escape from the borehole at high pressure, igniting upon contact with nearby electrical wires, reports BSS.

Following the incident, three fire service units from Ukhia and Cox’s Bazar Sadar arrived at the scene around 8 am and began efforts to extinguish the fire.

Confirming the incident, Syed Md Morshed Hossain, deputy assistant director of the Cox’s Bazar Fire Service, said, "Our three units are working continuously to bring the fire under control. Additionally, an army fire team has been assisting with the containment efforts since 2:30 pm. The intensity of the fire is heightened by the escaping gas. To prevent any untoward accidents, the electricity supply to the entire area has been temporarily suspended."

Meanwhile, local residents are gripped by intense panic, as the fire has persisted despite repeated attempts to smother it with sandbags, and there are concerns that it could spread further.

Concerned locals have called for the fire to be extinguished promptly and urged a geological survey to determine whether a significant gas reserve exists at the site.​
 

Bangladesh needs a strategy to wean itself off imported gas

Rassiq Aziz Kabir and Ismot Hasnine Masrur E Khuda

1793147082776.webp

Commuters wait in long queues at a refilling station in Dhaka on March 12, 2026. FILE PHOTO: MEHEDI HASAN

Energy has rarely been treated as anything more than a question of tariffs and subsidies in the concurrent policy discourse of Bangladesh. However, the war that began with the US-Israeli strikes on Iran on February 28 and the resulting disruption of shipping through the Strait of Hormuz have changed the scenario. By April, Qatar invoked force majeure on its LNG contracts, diesel stocks fell below 10 days of cover, and Bangladesh had to ration fuel sales. Nearly eight months on, the emergency has settled into a chronic condition. We still rely on imported fuel to keep our power plants, factories and farms running, leaving us exposed to shocks beyond our control. It is now clear that energy is a matter of national security.

The price of this exposure is visible across the economy. By mid-September, Bangladesh was paying nearly $30 per million British thermal units (MMBtu) for spot LNG, almost three times the pre-war rate. Zero Carbon Analytics, an international research group, projected that the country’s annual energy import bill of roughly $12 billion could rise by $4.8 billion, or 40 percent, if the elevated prices persist. The energy ministry projects this year’s LNG subsidy bill at Tk 40,000 crore, nearly triple last year’s payout, while electricity subsidies could reach Tk 50,000 crore. Consumers have not been spared either, as retail electricity prices were raised by 16.68 percent in June. More recently, the World Bank’s forecast cut Bangladesh’s growth to 3.4 percent in FY2026-27, citing a more protracted drag from energy shortages.

The roots of the problem go back almost a decade. In 2018, Bangladesh began importing LNG as a stopgap to address declining domestic gas output, which has since fallen by about 30 percent over six fiscal years. That stopgap has now become a crutch, and an expensive one, with Petrobangla’s LNG import bill rising from Tk 16,505 crore in FY2020-21 to around Tk 59,000 crore in FY2025-26. Domestic fields currently produce around 1,620 million cubic feet per day (mmcfd) of gas against an estimated demand of 3,860 mmcfd. Even with imported LNG, this leaves a shortfall of roughly 32 percent. Domestic production is itself concentrated, with a single field in Habiganj supplying about half of it. Meanwhile, imported fossil fuel now accounts for about 59 percent of our trade deficit.

What makes this dependence dangerous is the level of concentration. Between January 2025 and March 2026, the Middle East supplied 64 percent of our LNG, 69 percent of our LPG, and about 63 percent of our crude oil, as well as accounting for nearly half of over $30 billion in remittances received in FY2025-26. A single shock therefore inflates the import bill while threatening the inflows that pay for it.

Fuel rationing during the Boro season also endangers irrigation and food security. The concentration is physical as well as geographical. All imported LNG enters through just two floating terminals in Moheshkhali, which have been disrupted at least three times in as many years: Cyclone Mocha forced both terminals offline in May 2023; Cyclone Remal reduced capacity for nearly four months in 2024; and a terminal experienced a temporary, partial outage again in July 2026. Each time, the shortfall’s impact spread quickly and was felt across the country.

Japan, which imports almost all of its oil, was able to release supply worth 45 days of consumption from state and private reserves in March. This was possible because stockholding is a legal obligation in the country, rather than an administrative aspiration. By contrast, India’s strategic petroleum reserve, despite having a capacity of 5.33 million tonnes, can meet only about 9.5 days of crude requirement. Bangladesh is in an even weaker position, with no formal strategic fuel reserve at all. A legal obligation on the Bangladesh Petroleum Corporation (BPC) to hold 90 days of stock, phased in as storage expands and with stock levels published every month, should therefore be our first priority.

Bhutan offers a different lesson. Hydropower sold to India is its primary export and a major source of revenue. Bangladesh, by comparison, imports only 40 MW from Nepal and only during June-November, while India has withheld approval for an additional 20 MW, citing transmission constraints. In this regard, Dhaka should actively press New Delhi for a dedicated Bangladesh-Nepal transmission corridor. A four-country power trading agreement among Bangladesh, Bhutan, India and Nepal would also give the government’s Saarc ambitions their first concrete deliverable. At the same time, power imports must also be diversified so that cross-border trade does not simply replace one single-supplier dependence with another.

Meanwhile, more than a decade after settling our maritime boundaries, we have yet to make a major offshore gas discovery, even as India, Myanmar and Pakistan have expanded deepwater exploration. The Offshore Bidding Round 2026, with bids for 26 blocks due by November 30, must not see a repetition of the bidless 2024 round. Petrobangla should release seismic data free to pre-qualified bidders, clear approvals within 90 days through a single window, and reserve a carried stake for Bapex in each contract to keep offshore expertise at home.

Supply contracts need similar reform. Qatar has extended its supply disruption notices to Bangladesh while, in August, 22 cargoes were approved without tender. The recent deal for 117 US LNG cargoes up to 2038 is a start, but diversification must become the rule. Still, diversified contracts will mean little without the capacity to receive them, which is why the government’s decision to fast-track a third floating terminal at Kutubjom must translate into delivery.

Future long-term agreements should cap Gulf-sourced volumes at no more than half of all annual LNG imports, with the balance contracted from the US, Australia or Malaysia, and include supplier substitution clauses. Spot purchases should be made only from a panel of suppliers pre-qualified through an open tender each quarter, with the price and supplier of every emergency cargo disclosed within 30 days.

Finally, none of this will hold without an institutional home. An energy security council under the Prime Minister’s Office, bringing together the energy, finance, foreign and expatriates’ welfare ministries, should run quarterly stress tests against 30-, 90-, and 180-day closures of Hormuz and publish the results.

In 2022, the Russia-Ukraine war triggered fuel price hikes and nationwide load-shedding, a warning we largely failed to heed. Recent weeks offer a further lesson. Only a month after signing a sweeping sanctions law against Russia, the US president announced a deal to import Russian diesel, reversing a policy that was in place since 2022.

Large economies can afford such abrupt turns. Bangladesh cannot. Our contracts and terminals lock in choices for decades, so every decision in this crisis must be weighed carefully.

Rassiq Aziz Kabir is an academic and public policy analyst.

Ismot Hasnine Masrur E Khuda is a researcher and energy policy analyst.​
 

BD holds huge growth potential in clean energy sector


1793231992967.webp



The size of Bangladesh’s domestic market offered considerable growth potential for entrepreneurs, Murray Spence, Australian Trade and Investment Commissioner for South Asia, told the FE.

Australia has a population of around 28 million, compared with Bangladesh’s population of approximately 177 million to 178 million, he noted.

“That’s more than six times the size of our market. So there is great scope for growth,” he said, adding that Australia is looking to partner with Bangladeshi businesses to expand solar power generation, battery storage and energy-management solutions, as the country’s reliance on fossil fuels and difficulties in securing energy supplies create an urgent case for accelerating the clean-energy transition.

An Australian government-funded study has identified 10 potential areas of cooperation in Bangladesh, with Australian companies exploring opportunities to introduce their technologies, expertise and systems through partnerships with local businesses.

“We know that Bangladesh, due to factors beyond its control, is facing an energy crisis, and its reliance on fossil fuels and the current challenges in securing them make this an urgent case,” Murray Spence, Australian Trade and Investment Commissioner for South Asia, told The Financial Express in an interview.

The report, outlining potential projects and challenges in Bangladesh’s renewable energy sector, was launched on Sunday as part of an Australian initiative to deepen business-to-business cooperation and help accelerate the country’s clean-energy transition.

Mr Spence said an Australian delegation comprising eight companies and 10 representatives had visited Bangladesh to assess market opportunities and explore partnerships in solar power, battery storage, rooftop installations, skills development and energy-efficiency solutions.

The delegation includes companies working in residential, commercial, industrial and utility-scale solar power, as well as battery storage and systems designed to improve the efficiency of electricity use.

“We have the technology. We are looking for local partners, and together they can identify projects and determine how to roll them out,” he said, adding that the initiative was at an early stage of assessing which Australian technologies could be adapted to Bangladesh and how they could be deployed.

He stressed that the immediate objective was to establish partnerships rather than commit to direct investment.

The Australian companies could explore different business models, including technology licensing, franchising and joint ventures, depending on the opportunities and their long-term interests in Bangladesh.

Poor-quality solar panels that fail to deliver their advertised output could weaken Bangladesh’s clean-energy transition, an Australian trade official has warned, urging the country to tighten product regulation and establish reliable testing systems as it expands renewable power amid an energy crisis.

Talking to the FE, Murray Spence, Australian Trade and Investment Commissioner for South Asia, said Bangladesh needed stronger oversight to ensure solar equipment installed on homes, businesses and factories performed as promised. He warned that mismatched power ratings could erode consumer confidence, waste investment and limit the contribution of solar power to national energy security.

“I think there needs to be some regulation,” Mr Spence told The Financial Express, suggesting that Bangladesh establish a dedicated testing body or deploy trained personnel to assess solar equipment and monitor its performance.

Australia has developed expertise across the clean-energy value chain, from electricity generation and storage to transmission, grid integration and efficient consumption, he said.

“Australia began its journey 20 years ago in clean energy. We now have the capability to generate electricity, but it is not just about generation. It is also about storing it, transmitting it, integrating it into the grid, and using it efficiently and effectively,” he said.

Some Australian states have achieved periods of electricity generation from 100 per cent renewable sources, while others generate surplus electricity that can be supplied to other parts of the country, he added.

The visiting delegation also includes a company representing one of the world’s largest battery installations developed in Australia, according to Mr Spence.

He said Australian companies could help Bangladesh develop the skills needed to install, operate and maintain rooftop solar systems, while introducing digital and computer-based solutions to monitor performance and identify technical problems.

Such systems could help businesses and households ensure that the electricity generated by solar panels is being used efficiently, he added.

He suggested that Bangladesh could consider establishing or strengthening an authority responsible for testing and regulating solar products installed on residential, commercial and industrial rooftops.

Australian companies could support such efforts by sharing technical expertise, providing training and helping develop systems to assess equipment performance, he said.

Training could also create employment opportunities for local workers in solar installation, cleaning, maintenance and performance monitoring.

Mr Spence said Australian companies would maintain their quality standards while operating in Bangladesh and could help introduce relevant Australian standards and technical practices.

He clarified that Australia was not seeking to influence Bangladesh’s choice of equipment suppliers or prevent it from buying products from China or elsewhere.

“People will buy from wherever they want. It is their choice,” he said, adding that the priority should be to ensure that products meet appropriate quality and performance standards.

The commissioner said Australian representatives had previously met Bangladeshi ministers and officials at the Prime Minister’s Office to share their experience and offer policy recommendations.

Among the issues raised were substantially reducing tariffs on imported solar components and establishing appropriate standards, he said.

He also welcomed Bangladesh’s efforts to introduce policies encouraging investment in battery storage and enabling consumers to use stored electricity when needed, or feed surplus power into the grid where the necessary infrastructure is available.

Mr Spence said the Australian government-funded study would help identify concrete projects and give prospective investors a clearer understanding of the opportunities and challenges in the local market.

The 10 potential areas outlined in the report are intended to provide a basis for discussions with Bangladeshi authorities and business partners, with the aim of translating broad clean-energy ambitions into practical projects.

Mr Spence said he hoped that by the time another delegation visited Bangladesh next year, some of the companies currently exploring the market would already be working with local partners on projects.

The initiative, he said, was intended to match Australian technology and expertise with Bangladesh’s renewable-energy needs, while allowing businesses on both sides to determine which partnerships and projects were commercially viable.​
 

Bangladesh cannot wait two years to manage its energy demand

M Niaz Asadullah


1793320463088.webp

FILE VISUAL: STAR

Finance Minister Amir Khasru Mahmud Chowdhury recently acknowledged that Bangladesh needs at least two years to stabilise its energy sector and the wider economy. The admission is sobering, but also useful. It raises a question that deserves more attention: if adequate supply cannot be restored soon, how will the country manage with scarce energy during the next two years?

The government does have plans for new wells, production-sharing contracts (PSCs), solar generation, LNG terminals, and an energy hub near Khulna. Japan’s $317 million Emergency Support Loan, highlighted during Prime Minister Tarique Rahman’s Tokyo visit, is also relevant as it supports economic and energy reforms, not a specific power plant. But these initiatives will be helpful in the medium term at best. Wells, terminals, pipelines, and renewable projects require time, capital, and capable institutions. Until they deliver, the government must decide who receives scarce energy, at what price, and with which level of reliability.

As things stand, Bangladesh is not short of installed power plants. A recent Panam Institute policy note estimates the country’s grid capacity at about 28,900 MW, against a record generation of only 17,200 MW. Its message is that the system is short of gas and money, not power plants. The same note reports that domestic gas production has been falling since 2016-17, while imports rose from contributing 47.7 percent to 62.5 percent of primary energy between 2020-21 and 2024-25.

My recent conversation with a leading industrialist in the energy business pushed me beyond this familiar supply-side diagnosis. His argument was that the deeper problem lies in industrial policy. For decades, extraordinarily cheap domestic gas influenced where firms invested, what they produced, and how much they focused on energy efficiency. Bangladesh did not pursue textbook import-substituting industrialisation throughout the 1980s and 1990s; those decades also brought trade liberalisation and the rise of export-oriented garments. But policies protected and promoted domestic processing industries such as steel re-rolling, fertiliser, ceramics, glass, cement, and textiles while gas and electricity remained priced below their full economic cost.

That model could appear successful while domestic gas was plentiful, but it is harder to justify when the marginal unit is imported LNG. An industry that saves one dollar of imports but requires more than a dollar of imported fuel, foreign exchange, and public subsidy is not genuinely saving foreign exchange. It is merely replacing one import bill with another, while part of the cost is concealed in the accounts of Petrobangla, the Bangladesh Power Development Board, and in the national budget.

This does not make steel, ceramics, or glass inherently undesirable. They create jobs and supply essential inputs. The relevant question is whether a new project or major expansion can compete when charged the full, long-run cost of reliable energy. Existing workers and capital cannot be moved without serious disruption. New investment, however, should not receive an open-ended entitlement to subsidised energy.

The allocation problem is already substantial. Industries directly consume about 19 percent of Bangladesh’s gas, while captive power generation inside factories accounts for another 17 percent—together more than one-third of supply, according to the Panam Institute policy note. However, the rules governing how shortages are distributed among grid power, industrial processes, captive generation, fertiliser production, and households remain unclear to the public. In practice, allocation is determined by pressure fluctuations, unplanned outages, administrative discretion, and political access. This is industrial policy by default, rather than by design.

This is where I partly agree with former energy adviser Muhammad Fouzul Kabir Khan’s warning that politicians and their business associates helped create today’s gas crisis. He pointed to unnecessary generation capacity, promises of industrial gas connections when gas was unavailable, and connections awarded through corruption. My argument is complementary but broader: even without an illegal transaction, a policy regime can create the wrong industrial structure when it socialises energy costs while privatising the returns.

Additionally, Professor Anu Muhammad’s recent diagnosis in this newspaper emphasises imported-energy dependence, weak national capability, and the political interests surrounding large projects. Here, a comparison with Malaysia is especially instructive. Malaysia built Petronas into a capable national institution rather than treating lack of domestic capacity as a permanent excuse. Bangladesh must likewise strengthen Bapex and Petrobangla while using foreign firms for capital and specialised knowledge under transparent contracts. But stronger supply institutions still need a disciplined demand policy.

For the next two years, grid management must therefore become an explicit part of industrial policy. The government should publish and enforce clear rules for rationing gas and electricity during shortages; introduce predictable time-of-use tariffs for large consumers; replace arbitrary interruptions with scheduled curtailments; and set public reliability standards for industrial zones. Efficient exporters should be able to plan production rather than discover their effective energy allocation through the duration of an outage. Major sectors should also be assessed for energy intensity, value added, employment, and net foreign-exchange contribution. Any subsidy that remains should be transparently accounted for in the budget, carry a time limit, and be justified by measurable economic benefits.

Over the longer term, new energy-intensive production should cluster near ports, fuel storage, regasification facilities, renewable resources, and common utilities. “Off the national grid” should not mean thousands of unregulated diesel generators, but rather serviced industrial-energy zones using dedicated generation, cogeneration, direct contracts, or transparently priced grid connections. The most energy-intensive stages may sometimes be better located in energy-abundant economies such as Malaysia, while fabrication, distribution, and higher-value activities remain in Bangladesh. Temporary duty relief for heavy fuel oil may ease an emergency, but it should be time-bound and tied to efficiency and emissions standards rather than becoming another permanent subsidy.

The costs of this model are now becoming harder to avoid. Cheap domestic gas helped generate profits and keep input costs low, but it also weakened incentives to explore, conserve, and invest in efficient machinery. The same business leaders who benefitted from that model for decades now find themselves grappling with unreliable supplies and the high cost of imported LNG.

The finance minister’s two-year timetable should be treated as more than a forecast; it should be viewed as a deadline for replacing implicit rationing with transparent demand management.

Bangladesh must accelerate exploration, renewable energy, and import infrastructure while also deciding which uses of scarce energy generate enough social and economic value to justify their cost. Otherwise, the country will continue allocating energy through outages, influence, and inherited privilege.

Dr M Niaz Asadullah is professor of economics at Dhaka University and a visiting professor at the University of Reading in the UK.​
 