Indian Railways Upgrades Modern 12-Wheel Electric Engines To Boost Train Speed, Completes Trial At Fazalganj | Details​

Story by Kamakshi Bishnoi

Let Copilot break it down—see the key takeaways in seconds.
1743577597152.png


Indian Railways Upgrades Modern 12-Wheel Electric Engines To Boost Train Speed, Completes Trial At Fazalganj | Details

Indian Railways Upgrades Modern 12-Wheel Electric Engines To Boost Train Speed, Completes Trial At Fazalganj | Details
As Indian Railways marks 100 years of electric engines, it is now focusing on modernization. New, compact 12-wheel engines, replacing the existing 16-wheel models, will soon be installed in all passenger trains. Despite their smaller size, these engines will maintain the same power and capacity, improving train speed and ensuring a more comfortable experience for drivers. Additionally, their maintenance will be more efficient.

Amazon Global SellingSell in America with Amazon.

The repair trials for these engines have been successfully conducted at the Fazalganj Electric Loco Shed. They are being manufactured at Chittaranjan and Varanasi Locomotive Works in West Bengal.

India's first electric engine ran in February 1925 during British rule, marking Asia’s introduction to electric rail transport. Over the years, continuous technological advancements have transformed engine designs, making them fully indigenous. Currently, most passenger train engines have 16 to 20 wheels, but they will now transition to 12 wheels while retaining a 12,000-horsepower capacity.


-Waterless Toilets: Air-pressure cleaning system with waste collection in a box instead of on the tracks.

-Enhanced Driver Comfort: Improved seating and better ventilation for locomotive drivers.


Related video: How the Vande Bharat Express is revolutionising train travel (India Today)


View on WatchView on Watch

New vs Old Engines

-Freight train engines, previously 45 feet long with 24 wheels, will now have 16 to 20 wheels and a reduced length of 24 to 28 feet.

-Passenger train engines, currently 24 feet long with 16 wheels, will be replaced by 20-22 feet long engines with 12 wheels and more powerful motors. Future designs aim for even more compact and powerful engines.

The new engines are being repaired in the modern Traction Motor (TM) shop, equipped with advanced facilities. Since they are entirely indigenous, maintenance has become simpler and more efficient.

"In the near future, smaller yet more powerful engines will be developed to further enhance railway efficiency," said Rahul Tripathi, Senior Divisional Electrical Engineer, Fazalganj Loco Shed.

READ MORE: Lucknow E-Rick Menace: Transport Dept Cracks Down On Illegal E-Rickshaws And Autos, Identifies Over 36,000 Unfit Vehicles

 

Attachments

  • 1743577597160.png
    1743577597160.png
    68 bytes · Views: 20

BEML to start bullet train work this September​

Story by Manu Kaushik
• 15h•
3 min read
In this article
BEML Ltd
BEML▼‎-1.45%‎
1748416530624.png


manufacturing, BEML, railways, bullet trains, indian railways.

manufacturing, BEML, railways, bullet trains, indian railways.
State-owned BEML will begin manufacturing India’s first bullet train prototype in September this year at its existing facility in Bengaluru, which also produces Vande Bharat sleeper trainsets. The first bullet trainset is slated for speed testing by December next year, BEML chairman and managing director Shantanu Roy told FE. BEML has been awarded the contract for the design, manufacturing, and commissioning of two high-speed trainsets.

Free Proforma Invoice Template - Edit, Print, Download or Email - Create Professional Invoices


“The work is at the design stage right now. The critical design part should be over in a couple of months, and we will start the manufacturing activity by September. It involves a lot of new learning and the next level of technology in areas like passenger safety, sheet metal work, welding, signalling, and train control management system (TCMS),” Roy said.

ALSO READ
India’s bullet train journey is nearing its destination
In October last year, the Integral Coach Factory (ICF) tasked BEML with indigenously producing two high-speed trainsets, each comprising eight coaches and designed to reach speeds of 280 kmph. While the trains will be tested at 280 kmph, their operational speed will be 249 kmph. The total project cost is Rs 866.87 crore, translating to Rs 27.86 crore per coach, significantly lower than the latest Shinkansen coaches, which cost Rs 46–48 crore each.



BEML, Bengaluru-based defence PSU, claims its high-speed trains are more cost-effective than those of competitors, thanks to domestic sourcing of products and components — including the stainless steel used to manufacture Roy said that BEML expects to have the first coach (of the train) ready by the end of FY26 which will then undergo rigorous testing. “In a high-speed train, weight is most important so it has to be lightweight. Some tests that will carried out include squeeze test and climatic chamber test which is meant to check its durability in different conditions. Once this coach is approved, there will be a bulk production of 15 more cars which won’t take much time,” he said.

By December 2026, the first bullet train prototype is expected to be rolled out for oscillation trials and speed testing, which will be conducted on the actual Mumbai-Ahmedabad High-Speed Rail (MAHSR) corridor.


Further, Roy said BEML has engaged a host of consultancies to keep a close check on the quality and processes. “For validating our design, we have built several layers. We have onboarded a design verification agency that is an internationally reputed firm, which has already done work on such projects. We also have a design validation agency, which will carry out all the testing. We will rope in experts who will guide us in welding because welding is critical. Then, there will be an independent safety assessor,” he said.As part of the National Infrastructure Pipeline (NIP), the ministry of railways has identified seven high-speed rail corridors. These include routes such as Delhi–Varanasi (813 km), Delhi–Ahmedabad (872 km), Mumbai–Nagpur (767 km), Mumbai–Hyderabad (671 km), Chennai–Bengaluru–Mysuru (464 km), Delhi–Chandigarh–Amritsar (476 km), and Varanasi–Howrah (752 km). Detailed project reports for at least four of these corridors have already been submitted.


ALSO READ
Mumbai-Ahmedabad Bullet Train: Major breakthrough propels India’s high-speed rail dream forward
Roy said that BEML is equipped to grab more opportunities in this space. “ We are training our existing manpower, and ramping up the capacity to take on more rail projects,” he said.The MAHSR project is being implemented with official development assistance from JICA, which is providing a loan at an interest rate of 0.1%. JICA is funding 81% of the construction and procurement costs, while the remaining amount is being shared by the central government and the state governments of Maharashtra and Gujarat.
 
India Was Forced to Order 39,000 Wheels from China for $21 Million—Why Not Choose Japan



China is always a cheap source for low tech items. We imported wheel from China and will import trainset from Japan.

This is matter of past. India is making its own bullet train which will be ready for testing in a year of time.
 
China is always a cheap source for low tech items. We imported wheel from China and will import trainset from Japan.

This is matter of past. India is making its own bullet train which will be ready for testing in a year of time.
What a great way to masturbate....

Screenshot_20250528_213533_com_microsoft_emmx_ChromeTabbedActivity.jpg


I have always admired the jokes provided by India, a backward agricultural country.
 

Latest Tweets

Mainerik HarryHeida Mainerik wrote on HarryHeida's profile.
Hello

Members Online

Latest Posts

Back
... ... ... ... ... ... ... ...