[🇧🇩] Save the Rivers/Forests/Hills-----Save the Environment

  • Thread starter Thread starter Saif
  • Start date Start date
  • Replies Replies 348
  • Views Views 4K
[🇧🇩] Save the Rivers/Forests/Hills-----Save the Environment
348
4K
More threads by Saif

G Bangladesh Defense Forum

Sink-based solutions can ease Chattogram's waterlogging

1741826293016.png

Between 1989 and 2011, approximately 15 percent of the exposed land in the Sholakbahar ward of the city was converted into various types of built-up areas, increasing the risk of waterlogging. FILE PHOTO: PALASH KHAN

Waterlogging in our port city in recent years has caused enormous suffering and economic loss. The government of Bangladesh has recently initiated efforts to find sustainable solutions to this problem. This hydro-climatic disaster occurs when the amount of source water exceeds what the sinks can accommodate. A better understanding of the sources and sinks of water will foster sustainable solutions to this issue.

Waterlogging primarily occurs during the monsoon season, characterised by heavy rainfall. A practical solution entails—(i) identifying the sinks and (ii) enhancing their capacity to ensure that the volume of water from the source does not surpass it. Furthermore, we must tackle the factors that diminish the capacity of sinks, such as landfilling, the removal of hills, and eutrophication, among others.

Inland water bodies

The most easily accessible water sink is the inland water bodies, which include ponds, lakes, canals, and drainage networks. To get a rapid solution to waterlogging, we must increase the water-retention capacity of these inland water bodies. Dredging is a proven method to enhance the volume of water that reservoirs can hold. Additionally, dredging boosts interactions between lake water and groundwater. However, it is vital to manage the dredged materials properly, as mismanagement can cause them to return to the water bodies shortly thereafter.

During heavy rainfall on certain days in the rainy season, a significant volume of water rapidly accumulates on the surface. This extra water necessitates enhanced drainage systems to keep the city free from flooding. Expanding and deepening the canals could increase their capacity to handle excess water. Furthermore, we could construct new lakes and drainage systems within the city, particularly in the areas most affected; this approach could significantly enhance the water retention capacity.

Alongside enhancing the capacity of the sinks, it is equally crucial to mitigate factors that restrict the volume of sinks—(i) landfilling in any form must cease immediately; (ii) hill-cutting should be halted as it generates a large volume of clastic sediment, much of it ends up at the bottom of inland water bodies; (iii) strict solid waste management must be enforced to prevent any forms of solid waste, such as non-degradable plastics and household materials, from entering the drainage system as solid waste can restrict flow velocity and reduce the water retention capacity of reservoirs; and (iv) chemical and bio-waste from domestic and industrial sources should be segregated and disposed of separately since inland water bodies gradually lose volume due to harmful algal blooms and eutrophication, exacerbated by increased nutrient levels from such waste.

The groundwater sink

Groundwater is a crucial destination for rainwater through the process of infiltration. Unfortunately, this aspect is often overlooked when planning to eliminate waterlogging. The reduction of open land restricts the infiltration process. Consequently, a substantial volume of water overflows that should ideally transfer into the groundwater; an increase in surface water heightens the likelihood of waterlogging. A research paper published by the Department of Geography and Environmental Studies at the University of Chittagong finds that between 1989 and 2011, approximately 15 percent of the exposed land in the Sholakbahar ward of the city was converted into various types of built-up areas. The situation is presumably similar in other wards of the city corporation. Reducing such a significant amount of open space presents a serious risk of waterlogging.

Increasing the amount of open space is a potential measure to ensure accelerated infiltration. Additionally, we could construct tiny artificial ponds throughout the city, designed with coarser rocks at the bottom, as fine-grained particles limit infiltration. The ponds need not be large; they could be situated along the streets in a manner that also contributes to the city's beautification. Furthermore, we can plan to establish recharge wells and soak pits to enhance infiltration into the groundwater.

Impermeable streets also impede groundwater recharge. Permeable city roads can be constructed to facilitate the percolation of more water from the lane into the ground.

By implementing the aforementioned sink-based solutions, the city's waterlogging problems can be eased. In addition to tackling waterlogging, these measures will enhance functional hydrology and foster a clean aquatic environment that aligns with biodiversity.

Mohib Billah is doctoral researcher in the Department of Geography and Geology at the University of Turku in Finland.​
 

Over 600 trees felled at Dinjapur’s Karai Beel; case filed
1741911332715.png

Photo: Kongkon Karmaker

A case has been filed following the felling of over 600 fruit-bearing and timber trees at Karai Beel, a once-thriving natural sanctuary renowned for its biodiversity and scenic beauty, in Dinajpur's Biral upazila.

The beel is situated alongside Ramsagar and Sukhsagar, two of Dinajpur's largest manmade waterbodies. Karai Beel has long been a vital ecological and agricultural resource.

The large-scale tree felling, allegedly carried out by leaders of the Biral Muktijoddha Poultry and Livestock Cooperative Society, has raised serious concerns among local residents and environmental activists.

Yesterday, locals seized the felled trees and filed a case against two named individuals and 10-12 unidentified persons for illegal logging.

According to the First Information Report, the primary suspects in the case are Aibur Rahman 68, of Biral upazila and Jobaidur Rahman 55, a timber trader from West Ramnagar Gobrapara under Dinajpur Sadar upazila and the district president of Matsyajibi Dal.

1741911454448.png

Photo: Kongkon Karmaker

Karai Beel spans 56.10 acres in Shankarpur Mouza and is classified as state property.

On Monday afternoon, the accused, along with several others, were seen cutting trees around the beel and transporting them using tractors.

Receiving information, the union land official rushed to the scene and seized the felled trees.

However, one tractor carrying 55 mango trees had already been moved elsewhere.

Authorities managed to confiscate an additional 170 mango trees, two jackfruit trees, and 1,489 cubic feet of firewood before further transportation.

Forest officials confirmed that the logging was done without obtaining prior authorisation.

"As per regulations, any tree felling must be reported to the local Forest Department. However, we were not informed about the cutting of Karai Beel's trees," said Mohsin Ali, beat officer of the Forest Department.

Following notification from the upazila administration, forest officials seized the logs and transported them to the local police station for further investigation.

Jobaidur Rahman, one of the accused, claimed to have legally purchased the trees through a tender process for Tk 4.1 lakh, with the amount deposited in Sonali Bank.

He asserted that cooperative leaders assured him they would settle the issue with the administration.

The Biral Muktijoddha Poultry and Livestock Cooperative Society was originally formed in 1974 by local freedom fighters, who leased Karai Beel from the government for fish farming. In 1977, the then president, Ziaur Rahman, allocated funds for digging a pond as part of a canal excavation programme, leading to the establishment of a tree plantation around the embankment.

Although society members later obtained ownership of the pond, the administration revoked their lease years later, leading to an ongoing land dispute in court, according to well placed sources of the government and cooperative body.

At a press conference today, Mokhsed Ali Mongolia, acting president of the cooperative and a BNP leader, denied any wrongdoing.

"The trees were not stolen but sold with the approval of the cooperative's general assembly," he said.

He further explained that after the July and August political unrest, the pond became vulnerable to looting, and the trees were no longer yielding fruit.

"We decided to cut them down and convert the area into a litchi orchard," he said.

Biral Upazila Nirbahi Officer (UNO) Ishtiaq Ahmed, who is overseeing the investigation, confirmed that legal action has been taken due to violations in axing over 600 trees under public property laws.

The cooperative leaders have failed to provide a valid explanation against the tree axing, added the UNO.​
 

Gorer Khal on its deathbed
Yet another example of a poorly executed project

1741911784714.png


It is appalling to witness our rivers, canals, and such water bodies die one after another due to encroachment, pollution, and mindless development. One such canal is Gorer Khal at the Baniachong upazila in Habiganj. According to a report, the 19.2-kilometre-long canal was once a lifeline for the region's agriculture, communication, and flood management. But it is now on the verge of death due to illegal encroachment, pollution, and siltation. The Bangladesh Water Development Board (BWDB) took up a project at a cost of Tk 7.16 crore in FY 2022-23 to excavate and revive it but failed to do so. What, then, was the point of taking up such a project?

Clearly, the project was not properly planned or executed. Reportedly, while the project was underway, the authorities focused on digging the canal's branches instead of excavating its main body. Moreover, the excavation was allegedly conducted without proper land measurement or clearing encroachments. Additionally, the soil dug from the canal was piled up along its banks, which washed back into it during the monsoon. And although a total of 4,000 trees were supposed to be planted along the banks, this was not done either. All this explains why, around a year and a half into the work, the project has failed to bring any positive results.

Local residents also alleged corruption and misappropriation of funds by those who implemented it. Although the canal's situation has not improved at all, the project authorities have claimed that they did as far as they could, which shows their inefficiency and lack of sincerity. Unfortunately, the situation of Gorer Khal and the excavation project undertaken by the BWDB is not unique. Hundreds of such ill-executed projects can be found across the country. For instance, only the other day, a report published in this daily revealed how bridges built over the canals of Barguna were collapsing due to the use of poor-quality materials.

Corruption in development projects, whether large or small, was a recurring issue during the previous Awami League regime. This must come to an end. We urge the government to hold those responsible for such poorly planned projects accountable and reclaim canals like Gorer Khal to restore the vital lifelines of rural Bangladesh.​
 

Wasa pipeline chokes Bhairab
1741912557046.png


Rivers are the lifelines of Bangladesh, shaping its geography, economy, and culture. However, unchecked encroachment, pollution, and water withdrawal from upstream have left many rivers struggling to survive. Once-mighty rivers like the Padma, Bhairab, and countless others are drying up, forming vast shoals, disrupting agriculture, and forcing fishermen to abandon their livelihoods. The worsening crisis demands urgent attention and action. On this International Day of Action for Rivers, let's have a look at two of our rivers, which once used to flow gloriously, but are now being choked to death due to a lack of sustainable management, dredging, and pollution control.

The 20km part of Bhairab River, stretching from Khulna to Bagerhat, is shrinking into a stagnant canal due to a massive pipeline installed by the Khulna Water Supply and Sewerage Authority (Wasa).

The 56-inch-diameter pipeline, laid without an adequate environmental assessment, has severely disrupted the river's natural flow, causing heavy siltation and making navigation nearly impossible for boats and trawlers.

To protect the pipeline, Wasa later erected five- to six-foot-high iron structures, further worsening the situation.

These barriers obstruct boat movement, forcing fishermen and transporters to wait for high tide to cross. During low tide, the pipeline remains exposed, creating an impassable obstruction.

"Almost every day, I have to wait an extra six to seven hours for the tide to rise just to cross the pipeline," said Sabur Rana, a fisherman from Naihati village, Rupsha. "Khulna Wasa did this without thinking of our plight. We urge the authorities to resolve it immediately."

Mohammad Ali, a 75-year-old tea stall owner near the Mulghar Bridge, said, "This river, once 300 feet wide, has narrowed to just 20-25 feet over the years. The pipeline has made things worse."

The once-mighty Bhairab, vital for trade and transportation, is now struggling to survive. Businesses relying on river transport face immense hardship, with goods-laden boats frequently getting stuck.

In 2019, Water Development Board (WDB) undertook a Tk 24.23 crore excavation project to improve the river's water flow, dredging 17.5km of the river from Daratana in Bagerhat to Atharobaki in Khulna.

However, the benefits of this effort have been undone by the pipeline's installation.

Md Humayun Kabir, WDB sub-assistant engineer, said, "We opposed the pipeline installation. When the river flow was obstructed post-excavation, we warned them again. Instead of resolving the issue, they made things worse by erecting an iron cage."

Environmentalists say Bhairab's condition reflects the larger crisis facing Khulna's rivers.

Mahfuzur Rahman Mukul, divisional coordinator of the Bangladesh Environmental Lawyers Association (BELA), said, "Around 50 rivers in this region are under threat. A responsible government institution should protect them. The pipeline must be removed or relocated immediately."

WDB has repeatedly urged Wasa to relocate the pipeline, with even the deputy commissioner of Bagerhat writing to higher authorities, including the cabinet secretary, five times. Yet, no concrete action has been taken.

1741912625413.png


Khan Salim Ahmed, superintending engineer of Khulna Wasa, said steps are being taken to relocate the pipeline. "The estimation is complete, and a contractor has been appointed. We are working on laying the pipe deeper underground for a sustainable solution," he said.

However, locals remain skeptical, fearing that bureaucratic delays will further endanger the Bhairab's survival.​
 

Latest Posts

Back